--Base Binder

Clean the ground, and brush the glue at the cement ground .

--Flexible level installation points

Mix the binder with black granules by standard proportion, and mix the materials totally by mix machine.
Install the rubber floor by paving machine, keep the thickness around 8-9mm thick. All these work should be done before the base binder cured.
When finished the installation of paving machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the flexible level of rubber floor is finished.



-- EPDM level installation points

Mix the binder with colored EPDM granules by standard proportion, and mix the materials totally by mix machine. 
Install the rubber floor by paving machine, keep the thickness around 4-5mm thick. When finished the installation of paving machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the EPDM level of rubber floor is finished.



Nanjing Institute of Physical Education Stadium

Nanjing institute of physical education sports track and field is what we made in 2001. It is consist of red EPDM granule surface layer and black SBR base layer. So far it has been more than 10 years 

Nanjing Institute of Physical Education Stadium

Nanjing institute of physical education sports track and field is what we made in 2001. It is consist of red EPDM granule surface layer and black SBR base layer. So far it has been more than 10 years